Councils in Kent, East Sussex and Surrey are asked for 29,239 homes a year, double what they have been adding
Every council's minimum housing need comes from a national formula. We worked it out for all 29 councils in Kent, East Sussex and Surrey and set it against the homes each has actually added, with where each local plan has got to.
Facts checked against the sources below on 10 November 2026.
- homes a year: the formula's minimum for the 29 councils
- 29,239
- homes a year added, 2022-23 to 2024-25
- 14,874
- Sevenoaks's target against homes it added, the widest gap
- 6.7×
Nine councils have a target at least three times the homes they added
Standard method target as a multiple of homes added each year, 2022-23 to 2024-25
- Target three times homes added or more
- Two to three times
- Less than two times
Show the numbers
| Council | Target a year | Added a year | Multiple |
|---|---|---|---|
| Sevenoaks | 1,166 | 174 | 6.7× |
| Epsom and Ewell | 834 | 189 | 4.4× |
| Elmbridge | 1,586 | 381 | 4.2× |
| Eastbourne | 691 | 171 | 4× |
| Spelthorne | 795 | 207 | 3.8× |
| Rother | 895 | 259 | 3.5× |
| Mole Valley | 805 | 240 | 3.4× |
| Tandridge | 819 | 240 | 3.4× |
| Hastings | 686 | 222 | 3.1× |
| Reigate and Banstead | 1,281 | 469 | 2.7× |
| Surrey Heath | 699 | 301 | 2.3× |
| Tonbridge and Malling | 1,117 | 519 | 2.2× |
| Folkestone and Hythe | 818 | 384 | 2.1× |
| Woking | 803 | 390 | 2.1× |
| Lewes | 855 | 454 | 1.9× |
| Guildford | 1,151 | 631 | 1.8× |
| Tunbridge Wells | 1,100 | 621 | 1.8× |
| Waverley | 1,418 | 788 | 1.8× |
| Medway | 1,666 | 971 | 1.7× |
| Gravesham | 687 | 419 | 1.6× |
| Maidstone | 1,373 | 928 | 1.5× |
| Swale | 1,070 | 728 | 1.5× |
| Ashford | 986 | 692 | 1.4× |
| Canterbury | 1,199 | 846 | 1.4× |
| Runnymede | 640 | 446 | 1.4× |
| Thanet | 1,106 | 770 | 1.4× |
| Wealden | 1,465 | 1,072 | 1.4× |
| Dover | 772 | 631 | 1.2× |
| Dartford | 756 | 731 | 1× |
Source: Plot calculation of the standard method (NPPF August 2026, Annex D) from MHCLG Live Table 125 (dwelling stock, 2025) and ONS median workplace-based affordability ratios (2021 to 2025); homes added from MHCLG Live Table 122 (net additional dwellings, 2022-23 to 2024-25). Boundaries: ONS, OGL v3.
Target against homes added, council by council
Sevenoaks's target is 1,166 a year. It added 174
Homes a year: standard method target and average homes added, 2022-23 to 2024-25
- Standard method target, homes a year
- Homes added a year, three-year average
Source: Plot calculation of the standard method (NPPF August 2026, Annex D) from MHCLG Live Table 125 (dwelling stock, 2025) and ONS median workplace-based affordability ratios (2021 to 2025); homes added from MHCLG Live Table 122 (net additional dwellings, 2022-23 to 2024-25)
How the formula works
The target doesn't depend on how much land a council has. It starts from the number of homes already there and rises where homes are expensive relative to local pay. So Green Belt doesn't lower the figure: Sevenoaks, which is 92.9% Green Belt, has the widest gap, and Tandridge, at 93.9%, is at 3.4 times. We call the formula's figure the target. Strictly it's the minimum need; the number a council is held to is the requirement in its local plan, which can differ.
Start with 0.8% of existing homes
Sevenoaks had 52,393 homes in 2025, so its baseline is 419 a year.
Adjust for affordability
Its median home cost 14.38 times median local earnings on average over 2021 to 2025. Each 1% above a ratio of five adds 0.95%, which multiplies the baseline by 2.78.
That gives the minimum need
419 homes times 2.78 is about 1,166 homes a year, against 174 a year added over the last three years.
The formula in this form dates from December 2024 and raised most councils' figures, so the homes added from 2022 to 2025 were planned against lower numbers. The gap shows how far the new figures are above recent delivery, not that councils missed their old targets.
Where each council's plan has got to
A target only turns into sites through a local plan. Seven councils plan to submit their plans for examination by the end of 2026: Canterbury, Gravesham, Rother, Sevenoaks, Swale, Tonbridge and Malling and Wealden. The deadline for plans under the previous system was 31 December 2026; on 23 October 2026 the government extended it to 31 March 2027 for plans that finish their final consultation by the end of 2026. Five whose plans weren't far advanced have started again under the new plan-making system: Ashford, Folkestone and Hythe, Guildford, Runnymede and Thanet. Dartford and Spelthorne, which adopted plans recently, are starting their next plans under it too. For landowners, the next call for sites or consultation is the chance to put land forward.
Local plan stages, October 2026
From each council's own website. We could confirm 21 of 29; the rest are marked.
| Council | Where the plan is | Next step |
|---|---|---|
| Ashford | Starting again under the new system (Local Plan 2043) | Next local plan consultation, January 2027 |
| Canterbury | Final draft consulted on (Reg 19), March to May 2026 | Submission for examination was planned for September 2026; we couldn't confirm whether it has happened |
| Dartford | Plan adopted April 2024; new plan starting under the new system | Public consultation planned for early 2027 |
| Dover | Plan to 2040 adopted October 2024 | No review planned before 2027 |
| Eastbourne | Final draft (Reg 19) published 2 October 2026 | |
| Elmbridge | Not confirmed: check with the council | |
| Epsom and Ewell | Not confirmed: check with the council | |
| Folkestone and Hythe | Starting again under the new system | Consultation on proposed content, September to October 2027 |
| Gravesham | Final draft consulted on (Reg 19), April to May 2026 | Submission for examination, due by the end of 2026 |
| Guildford | Starting again under the new system | Consultation 7 April to 19 May 2027 |
| Hastings | Final draft out for consultation (Reg 19), 1 October to 12 November 2026 | Submission for examination |
| Lewes | Not confirmed: check with the council | |
| Maidstone | Local Plan Review adopted 20 March 2024 | |
| Medway | New plan submitted December 2025 and at examination | Further hearings from 17 November 2026 |
| Mole Valley | Local Plan 2020 to 2039 adopted October 2024 | |
| Reigate and Banstead | Not confirmed: check with the council | |
| Rother | Final draft out for consultation (Reg 19), 12 October to 24 November 2026 | Submission for examination before the end of 2026 |
| Runnymede | Starting again under the new system | Vision and strategy consultation, June to July 2027 |
| Sevenoaks | Final draft consulted on (Reg 19), July to September 2026 | Submission for examination, due by the end of 2026 |
| Spelthorne | Plan adopted March 2026; review started under the new system | Options consultation, February to March 2027 |
| Surrey Heath | Not confirmed: check with the council | |
| Swale | Final draft (Reg 19) published 10 August 2026 | Submission for examination, planned December 2026 |
| Tandridge | Not confirmed: check with the council | |
| Thanet | Starting again under the new system | Consultation 28 January to 12 March 2027 |
| Tonbridge and Malling | Final draft consulted on (Reg 19), September to October 2026 | Submission for examination, planned by 31 December 2026 (national deadline now 31 March 2027) |
| Tunbridge Wells | Local Plan 2020 to 2038 adopted 10 December 2025 | |
| Waverley | Not confirmed: check with the council | |
| Wealden | Final draft consulted on (Reg 19), September to November 2026 | Submission for examination, December 2026 |
| Woking | Not confirmed: check with the council |
Source: Councils' local plan pages and local development schemes, checked 28 October 2026
Check a council
The national formula sets Tonbridge and Malling a minimum of 1,117 homes a year. Over the last three years it added 519 a year on average, so the target is 2.2 times that.
- Target
- 1,117
- homes a year
- Added
- 519
- a year, 2022-23 to 2024-25
- Multiple
- 2.2×
- target against homes added
Local plan: Final draft consulted on (Reg 19), September to October 2026. Next: Submission for examination, planned by 31 December 2026 (national deadline now 31 March 2027).
Putting land forward: Call for sites closed March 2025.
How we did this
We applied the standard method in Annex D of the August 2026 National Planning Policy Framework to each of the 29 councils in Kent, Medway, East Sussex and Surrey, using the latest dwelling stock (2025) and the five most recent years of affordability ratios (2021 to 2025). Our results match the figures Reigate and Banstead gives in its 2026 housing monitor (1,281), and the same calculation on the previous year's inputs reproduces the 640 in Runnymede's September 2025 statement. Homes added are the average of the last three years of MHCLG's net additional dwellings. The 2025-26 figures are published on 26 November 2026, and we will update the page then. Plan stages come from each council's website; where we couldn't read it, we say so.
Read next
- The housing-need test for grey belt is met in 16 of Kent and Surrey's 18 Green Belt councilsIn 16 of the 18 Green Belt councils in Kent and Surrey, the national test of unmet housing need for grey belt is met. Figures for every council, with sources.
- A third of small housing applications in Kent, East Sussex and Surrey are now decided within eight weeksOnly 34% of applications for one to nine homes in Kent, East Sussex and Surrey were decided within eight weeks in the year to June 2026, against 77% in 2010.
- House prices in Kent, East Sussex and Surrey rose 35% in ten years, less than inflationThe typical home in Kent, East Sussex and Surrey sold for £385,000 in the year to August 2026, up 35% in ten years. Inflation was 41%.
Common questions
How are council housing targets worked out?
Under Annex D of the National Planning Policy Framework (August 2026), a council's minimum annual housing need starts at 0.8% of the homes already in its area. That is then raised where homes are expensive relative to local earnings: for each 1% the five-year average ratio of median house price to median workplace earnings is above five, the figure rises by 0.95%. Councils can plan for more.
Is the standard method the same as a council's housing requirement?
No. The standard method gives the minimum need. The housing requirement is the number a council adopts in its local plan after testing land, constraints such as Green Belt and National Landscapes, and what neighbouring councils can take.
What counts as homes added?
MHCLG's net additional dwellings: new homes built, plus conversions and changes of use, minus homes demolished. It is the government's main measure of housing supply.
When will these figures change?
MHCLG publishes the 2025-26 net additional dwellings on 26 November 2026, and we will update this page then. The dwelling stock and affordability inputs are updated each spring, which changes the targets.
Sources
- MHCLG, National Planning Policy Framework (August 2026), Annex D
- MHCLG, Live Table 125: dwelling stock estimates by local authority district (21 May 2026)
- ONS, House price to workplace-based earnings ratio (26 March 2026)
- MHCLG, Live Table 122: net additional dwellings by local authority district (20 November 2025)
- Reigate and Banstead, Housing Delivery Monitor 2026 (standard method figure)
- Runnymede, Five-Year Housing Land Supply Statement, September 2025 (standard method figure on 2024 inputs)
- MHCLG, Legacy system local plan extension: letter from the Housing Minister (23 October 2026)
- MHCLG, Local authority Green Belt statistics for England: 2025 to 2026 (22 October 2026)
- Planning Inspectorate, Local plans: monitoring progress (legacy system), updated 9 November 2026
- MHCLG, Housing and economic needs assessment guidance (standard method revised 12 December 2024)
- MHCLG, Housing supply: net additional dwellings, England: 2025 to 2026 (release announcement, 26 November 2026)
This guide is general information, not legal, tax or financial advice. Every site is different: take advice from a solicitor and an accountant before you sign anything.