PLOT

Councils in Kent, East Sussex and Surrey are asked for 29,239 homes a year, double what they have been adding

Every council's minimum housing need comes from a national formula. We worked it out for all 29 councils in Kent, East Sussex and Surrey and set it against the homes each has actually added, with where each local plan has got to.

Facts checked against the sources below on 10 November 2026.

homes a year: the formula's minimum for the 29 councils
29,239
homes a year added, 2022-23 to 2024-25
14,874
Sevenoaks's target against homes it added, the widest gap
6.7×

Nine councils have a target at least three times the homes they added

Standard method target as a multiple of homes added each year, 2022-23 to 2024-25

Medway: target 1,666 a year, added 971 a year (1.7×)Eastbourne: target 691 a year, added 171 a year (4×)Hastings: target 686 a year, added 222 a year (3.1×)Lewes: target 855 a year, added 454 a year (1.9×)Rother: target 895 a year, added 259 a year (3.5×)Wealden: target 1,465 a year, added 1,072 a year (1.4×)Ashford: target 986 a year, added 692 a year (1.4×)Canterbury: target 1,199 a year, added 846 a year (1.4×)Dartford: target 756 a year, added 731 a year (1×)Dover: target 772 a year, added 631 a year (1.2×)Gravesham: target 687 a year, added 419 a year (1.6×)Maidstone: target 1,373 a year, added 928 a year (1.5×)Sevenoaks: target 1,166 a year, added 174 a year (6.7×)Folkestone and Hythe: target 818 a year, added 384 a year (2.1×)Swale: target 1,070 a year, added 728 a year (1.5×)Thanet: target 1,106 a year, added 770 a year (1.4×)Tonbridge and Malling: target 1,117 a year, added 519 a year (2.2×)Tunbridge Wells: target 1,100 a year, added 621 a year (1.8×)Elmbridge: target 1,586 a year, added 381 a year (4.2×)Epsom and Ewell: target 834 a year, added 189 a year (4.4×)Guildford: target 1,151 a year, added 631 a year (1.8×)Mole Valley: target 805 a year, added 240 a year (3.4×)Reigate and Banstead: target 1,281 a year, added 469 a year (2.7×)Runnymede: target 640 a year, added 446 a year (1.4×)Spelthorne: target 795 a year, added 207 a year (3.8×)Surrey Heath: target 699 a year, added 301 a year (2.3×)Tandridge: target 819 a year, added 240 a year (3.4×)Waverley: target 1,418 a year, added 788 a year (1.8×)Woking: target 803 a year, added 390 a year (2.1×)City of London (London)Barking and Dagenham (London)Barnet (London)Bexley (London)Brent (London)Bromley (London)Camden (London)Croydon (London)Ealing (London)Enfield (London)Greenwich (London)Hackney (London)Hammersmith and Fulham (London)Haringey (London)Harrow (London)Havering (London)Hillingdon (London)Hounslow (London)Islington (London)Kensington and Chelsea (London)Kingston upon Thames (London)Lambeth (London)Lewisham (London)Merton (London)Newham (London)Redbridge (London)Richmond upon Thames (London)Southwark (London)Sutton (London)Tower Hamlets (London)Waltham Forest (London)Wandsworth (London)Westminster (London)SevenoaksElmbridgeDartford
  • Target three times homes added or more
  • Two to three times
  • Less than two times
Show the numbers
CouncilTarget a yearAdded a yearMultiple
Sevenoaks1,1661746.7×
Epsom and Ewell8341894.4×
Elmbridge1,5863814.2×
Eastbourne6911714×
Spelthorne7952073.8×
Rother8952593.5×
Mole Valley8052403.4×
Tandridge8192403.4×
Hastings6862223.1×
Reigate and Banstead1,2814692.7×
Surrey Heath6993012.3×
Tonbridge and Malling1,1175192.2×
Folkestone and Hythe8183842.1×
Woking8033902.1×
Lewes8554541.9×
Guildford1,1516311.8×
Tunbridge Wells1,1006211.8×
Waverley1,4187881.8×
Medway1,6669711.7×
Gravesham6874191.6×
Maidstone1,3739281.5×
Swale1,0707281.5×
Ashford9866921.4×
Canterbury1,1998461.4×
Runnymede6404461.4×
Thanet1,1067701.4×
Wealden1,4651,0721.4×
Dover7726311.2×
Dartford7567311×

Source: Plot calculation of the standard method (NPPF August 2026, Annex D) from MHCLG Live Table 125 (dwelling stock, 2025) and ONS median workplace-based affordability ratios (2021 to 2025); homes added from MHCLG Live Table 122 (net additional dwellings, 2022-23 to 2024-25). Boundaries: ONS, OGL v3.

Target against homes added, council by council

Sevenoaks's target is 1,166 a year. It added 174

Homes a year: standard method target and average homes added, 2022-23 to 2024-25

  • Standard method target, homes a year
  • Homes added a year, three-year average

Source: Plot calculation of the standard method (NPPF August 2026, Annex D) from MHCLG Live Table 125 (dwelling stock, 2025) and ONS median workplace-based affordability ratios (2021 to 2025); homes added from MHCLG Live Table 122 (net additional dwellings, 2022-23 to 2024-25)

How the formula works

The target doesn't depend on how much land a council has. It starts from the number of homes already there and rises where homes are expensive relative to local pay. So Green Belt doesn't lower the figure: Sevenoaks, which is 92.9% Green Belt, has the widest gap, and Tandridge, at 93.9%, is at 3.4 times. We call the formula's figure the target. Strictly it's the minimum need; the number a council is held to is the requirement in its local plan, which can differ.

  1. Start with 0.8% of existing homes

    Sevenoaks had 52,393 homes in 2025, so its baseline is 419 a year.

  2. Adjust for affordability

    Its median home cost 14.38 times median local earnings on average over 2021 to 2025. Each 1% above a ratio of five adds 0.95%, which multiplies the baseline by 2.78.

  3. That gives the minimum need

    419 homes times 2.78 is about 1,166 homes a year, against 174 a year added over the last three years.

The formula in this form dates from December 2024 and raised most councils' figures, so the homes added from 2022 to 2025 were planned against lower numbers. The gap shows how far the new figures are above recent delivery, not that councils missed their old targets.

Where each council's plan has got to

A target only turns into sites through a local plan. Seven councils plan to submit their plans for examination by the end of 2026: Canterbury, Gravesham, Rother, Sevenoaks, Swale, Tonbridge and Malling and Wealden. The deadline for plans under the previous system was 31 December 2026; on 23 October 2026 the government extended it to 31 March 2027 for plans that finish their final consultation by the end of 2026. Five whose plans weren't far advanced have started again under the new plan-making system: Ashford, Folkestone and Hythe, Guildford, Runnymede and Thanet. Dartford and Spelthorne, which adopted plans recently, are starting their next plans under it too. For landowners, the next call for sites or consultation is the chance to put land forward.

Local plan stages, October 2026

From each council's own website. We could confirm 21 of 29; the rest are marked.

CouncilWhere the plan isNext step
AshfordStarting again under the new system (Local Plan 2043)Next local plan consultation, January 2027
CanterburyFinal draft consulted on (Reg 19), March to May 2026Submission for examination was planned for September 2026; we couldn't confirm whether it has happened
DartfordPlan adopted April 2024; new plan starting under the new systemPublic consultation planned for early 2027
DoverPlan to 2040 adopted October 2024No review planned before 2027
EastbourneFinal draft (Reg 19) published 2 October 2026
ElmbridgeNot confirmed: check with the council
Epsom and EwellNot confirmed: check with the council
Folkestone and HytheStarting again under the new systemConsultation on proposed content, September to October 2027
GraveshamFinal draft consulted on (Reg 19), April to May 2026Submission for examination, due by the end of 2026
GuildfordStarting again under the new systemConsultation 7 April to 19 May 2027
HastingsFinal draft out for consultation (Reg 19), 1 October to 12 November 2026Submission for examination
LewesNot confirmed: check with the council
MaidstoneLocal Plan Review adopted 20 March 2024
MedwayNew plan submitted December 2025 and at examinationFurther hearings from 17 November 2026
Mole ValleyLocal Plan 2020 to 2039 adopted October 2024
Reigate and BansteadNot confirmed: check with the council
RotherFinal draft out for consultation (Reg 19), 12 October to 24 November 2026Submission for examination before the end of 2026
RunnymedeStarting again under the new systemVision and strategy consultation, June to July 2027
SevenoaksFinal draft consulted on (Reg 19), July to September 2026Submission for examination, due by the end of 2026
SpelthornePlan adopted March 2026; review started under the new systemOptions consultation, February to March 2027
Surrey HeathNot confirmed: check with the council
SwaleFinal draft (Reg 19) published 10 August 2026Submission for examination, planned December 2026
TandridgeNot confirmed: check with the council
ThanetStarting again under the new systemConsultation 28 January to 12 March 2027
Tonbridge and MallingFinal draft consulted on (Reg 19), September to October 2026Submission for examination, planned by 31 December 2026 (national deadline now 31 March 2027)
Tunbridge WellsLocal Plan 2020 to 2038 adopted 10 December 2025
WaverleyNot confirmed: check with the council
WealdenFinal draft consulted on (Reg 19), September to November 2026Submission for examination, December 2026
WokingNot confirmed: check with the council

Source: Councils' local plan pages and local development schemes, checked 28 October 2026

Check a council

The national formula sets Tonbridge and Malling a minimum of 1,117 homes a year. Over the last three years it added 519 a year on average, so the target is 2.2 times that.

Target
1,117
homes a year
Added
519
a year, 2022-23 to 2024-25
Multiple
2.2×
target against homes added

Local plan: Final draft consulted on (Reg 19), September to October 2026. Next: Submission for examination, planned by 31 December 2026 (national deadline now 31 March 2027).

Putting land forward: Call for sites closed March 2025.

Tonbridge and Malling's planning policy pages

How we did this

We applied the standard method in Annex D of the August 2026 National Planning Policy Framework to each of the 29 councils in Kent, Medway, East Sussex and Surrey, using the latest dwelling stock (2025) and the five most recent years of affordability ratios (2021 to 2025). Our results match the figures Reigate and Banstead gives in its 2026 housing monitor (1,281), and the same calculation on the previous year's inputs reproduces the 640 in Runnymede's September 2025 statement. Homes added are the average of the last three years of MHCLG's net additional dwellings. The 2025-26 figures are published on 26 November 2026, and we will update the page then. Plan stages come from each council's website; where we couldn't read it, we say so.

Common questions

How are council housing targets worked out?

Under Annex D of the National Planning Policy Framework (August 2026), a council's minimum annual housing need starts at 0.8% of the homes already in its area. That is then raised where homes are expensive relative to local earnings: for each 1% the five-year average ratio of median house price to median workplace earnings is above five, the figure rises by 0.95%. Councils can plan for more.

Is the standard method the same as a council's housing requirement?

No. The standard method gives the minimum need. The housing requirement is the number a council adopts in its local plan after testing land, constraints such as Green Belt and National Landscapes, and what neighbouring councils can take.

What counts as homes added?

MHCLG's net additional dwellings: new homes built, plus conversions and changes of use, minus homes demolished. It is the government's main measure of housing supply.

When will these figures change?

MHCLG publishes the 2025-26 net additional dwellings on 26 November 2026, and we will update this page then. The dwelling stock and affordability inputs are updated each spring, which changes the targets.

Sources

  1. MHCLG, National Planning Policy Framework (August 2026), Annex D
  2. MHCLG, Live Table 125: dwelling stock estimates by local authority district (21 May 2026)
  3. ONS, House price to workplace-based earnings ratio (26 March 2026)
  4. MHCLG, Live Table 122: net additional dwellings by local authority district (20 November 2025)
  5. Reigate and Banstead, Housing Delivery Monitor 2026 (standard method figure)
  6. Runnymede, Five-Year Housing Land Supply Statement, September 2025 (standard method figure on 2024 inputs)
  7. MHCLG, Legacy system local plan extension: letter from the Housing Minister (23 October 2026)
  8. MHCLG, Local authority Green Belt statistics for England: 2025 to 2026 (22 October 2026)
  9. Planning Inspectorate, Local plans: monitoring progress (legacy system), updated 9 November 2026
  10. MHCLG, Housing and economic needs assessment guidance (standard method revised 12 December 2024)
  11. MHCLG, Housing supply: net additional dwellings, England: 2025 to 2026 (release announcement, 26 November 2026)

This guide is general information, not legal, tax or financial advice. Every site is different: take advice from a solicitor and an accountant before you sign anything.