BNG exemptions from August 2026: what they mean for your land

Since early 2024, most new building has had to leave nature 10% better off than before. On 6 August 2026 the rules changed: small sites are now exempt, self-build isn't, and smaller schemes have more freedom in how they meet the 10%. Here's what that means if you own a garden, a paddock or a field you might build on, or sell.

Facts checked against the sources below on 10 November 2026.

Biodiversity net gain, or BNG, means a new development has to leave the site's wildlife habitat at least 10% better than it found it, measured with a government scoring tool called the statutory biodiversity metric. For small schemes it has been one of the more frustrating costs of the last two years: an ecologist's survey, a metric calculation, and sometimes a bill for habitat elsewhere, on a site with two or three houses. The changes that came into force on 6 August 2026 take most of that away for the smallest sites, and add it back for one group that used to be exempt.

New exemption threshold: 2,000 m², about half an acre
0.2 ha
Applies to applications made on or after this date
6 Aug 2026
Cost of each missing unit if bought as statutory credits
£84k

What changed on 6 August 2026

Three things, all made by one set of regulations (SI 2026/790), and all applying only to planning applications made on or after 6 August 2026 (variations of earlier permissions under section 73 follow the old rules):

  1. Sites of 0.2 hectares or less are exempt

    If the site inside the red line is no larger than 0.2 hectares and the development doesn't affect a priority habitat, BNG doesn't apply. The government's own example is two houses on a 0.16 hectare site. That covers most garden plots and many small paddocks.

  2. Self-build lost its exemption

    Until August, self-build and custom build schemes of up to nine homes on up to 0.5 hectares were exempt. That exemption has gone for new applications. A self-build scheme on more than 0.2 hectares now has to deliver the 10% gain like any other.

  3. Smaller schemes get more choice in how they meet the 10%

    For development that isn't 'major' (broadly, fewer than ten homes on a site under a hectare; half a hectare if the number of homes isn't yet fixed), improving habitat on site, creating it on site, and buying units from a registered off-site gain site are now equally acceptable. Before, on-site had to come first. Statutory credits remain the last resort.

A new exemption for temporary development, permitted for five years or less, also started on the same day.

Does BNG apply to your scheme?

The same schemes, either side of 6 August 2026
Applied beforeApplied on or after
Two homes on a 0.16 ha garden or paddockBNG appliesExempt, unless a priority habitat is affected
Five self-build plots on 0.4 haExempt (self-build)BNG applies
Three homes on 0.3 haBNG appliesBNG applies, with more freedom to buy off-site units
Two self-build homes on 0.18 haExempt (self-build)Exempt (0.2 ha), unless a priority habitat is affected
Class Q barn conversionExempt (permitted development)Exempt (permitted development)
Extension to your own houseExempt (householder)Exempt (householder)

How the 0.2 hectares is measured

The starting point is the red line on the location plan submitted with the application. That line should take in all the land needed to carry out the development, not just the house plots: the access from the road, visibility splays, landscaping, parking and open space around the buildings. A 0.19 hectare plot with a 30-metre drive and visibility splays onto the lane can tip over 0.2 hectares. If you're near the line, measure it properly before you draw the plans, and talk to your planning consultant about how the access is laid out.

If BNG does apply: what it can cost

If a scheme can't reach the 10% on site, the developer buys biodiversity units from a registered gain site, and only if none are available can it buy statutory credits from the government. Credits are priced to be expensive on purpose. For grassland and arable land, the habitat most of our sites start from, each credit costs £42,000, and you need two for every missing unit. Hedgerow units are priced separately, at £44,000 a credit.

What a shortfall costs if it's bought as statutory credits

Low and medium distinctiveness habitats such as grassland and cropland, tier A1 price

Show the numbers
Cost
0.1 units short£8,400
0.25 units short£21,000
0.5 units short£42,000
1 unit short£84,000

£42,000 per credit, two credits per unit. Statutory credits are the last resort and are deliberately priced above the off-site market so they don't undercut it. Prices from Defra's statutory credit price list (unchanged since 2023; page last updated 3 November 2026), reviewed every six months.

For a small housing scheme on a grass field the shortfall is often a fraction of a unit, but a fraction at £84,000 a unit adds up, before the ecologist's fees. That's why the 0.2 hectare exemption matters: it removes the metric, the gain plan and the bill, though you may still need an ecologist for protected species.

What it means if you're selling land

Garden plots and small paddocks. A site of 0.2 hectares or less with no priority habitat now carries no BNG cost at all, which makes it simpler to sell. Our garden guide has a worked example.

Self-build plots. Larger self-build schemes now carry a BNG cost they didn't before. It's usually manageable, and the self-build route can still pay the landowner more than a developer sale, as our comparison shows, but it belongs in the figures.

Barns. Class Q conversions are permitted development, so BNG doesn't apply. A full planning application for the same barn would be assessed under the normal rules, including the 0.2 hectare exemption.

The other side: selling biodiversity units from your land

Developers who can't reach 10% on their own sites have to buy units from land elsewhere, and that land can be yours. To sell units you measure the land's current value with the metric, create or improve habitat, register it as a biodiversity gain site, and commit to managing it for at least 30 years under a legal agreement. You can do it yourself, with neighbours, or through a habitat bank operator. It's a long commitment, and it will usually rule out building on that land for the term, so it suits land that has little development potential.

Before you apply

  1. Measure the red line, including the access

    0.2 hectares or less with everything the development needs, and you may be exempt.

  2. Check for priority habitats

    Native hedgerows, traditional orchards and old meadows. Avoid touching them if you can.

  3. Say which exemption applies on the application form

    The form asks you to state why the biodiversity gain condition doesn't apply. The council checks it at validation.

  4. If BNG does apply, price it in early

    Get the metric done before you agree a price or a plot layout, so the cost is in the figures from the start. Our land value calculator gives you a starting point for the land.

Common questions

What are the BNG exemptions in 2026?

Householder applications; permitted development; sites of 0.2 hectares or less (applications made on or after 6 August 2026); development affecting less than 25 square metres of habitat and less than 5 metres of hedgerow (de minimis); temporary development permitted for five years or less (from 6 August 2026); biodiversity gain sites; urgent Crown development; and HS2-related works. The 0.2 hectare, de minimis and temporary exemptions don't apply if the development affects an onsite priority habitat.

Is self-build still exempt from biodiversity net gain?

Not for new applications. The self-build and custom build exemption (up to nine homes on up to 0.5 hectares) only applies where the planning application was made before 6 August 2026, or where it's a section 73 variation of a permission that was itself exempt. A self-build scheme applied for since then is exempt only if it qualifies under another exemption, such as the 0.2 hectare one.

How is the 0.2 hectares measured?

Planning guidance says the red line on the application's location plan is the starting point. The red line should include all the land needed to carry out the development, including the access from the road, visibility splays, landscaping, parking and open space around the buildings.

Does BNG apply to Class Q barn conversions?

No. Development granted by a development order, which includes permitted development rights such as Class Q, is exempt from biodiversity net gain under Schedule 7A to the Town and Country Planning Act 1990, inserted by the Environment Act 2021.

Does BNG apply to permission in principle?

Permission in principle isn't itself a grant of planning permission, so it's outside BNG. The technical details consent that follows is a planning permission, and BNG applies to it unless an exemption does.

Sources

  1. Defra, Biodiversity net gain: exempt developments (updated 6 August 2026)
  2. MHCLG, Planning Practice Guidance: Biodiversity net gain (updated 31 July 2026)
  3. The Biodiversity Gain (Town and Country Planning) (Amendments and Transitional Provisions) (England) Regulations 2026 (SI 2026/790)
  4. Defra, Statutory biodiversity credit prices (updated 3 November 2026)
  5. Defra, Habitats and species of principal importance in England (section 41 list)
  6. MHCLG, Planning Practice Guidance: Making an application (red line boundary)
  7. Defra, Sell biodiversity units as a land manager
  8. Defra, Biodiversity net gain: considering a targeted exemption for brownfield residential development (consultation)
  9. HM Treasury, Budget 2026 (28 October 2026): BNG exemption for residential brownfield sites up to 1.5 hectares
  10. The Biodiversity Gain Requirements (Exemptions) Regulations 2024 (SI 2024/47), as amended

This guide is general information, not legal, tax or financial advice. Every site is different: take advice from a solicitor and an accountant before you sign anything.