Class Q lets a farm building become a home without a full planning application, through a cheaper and quicker prior approval. The rules widened in May 2024. Here's what qualifies, what doesn't, and why a third of Kent can't use it.

Facts checked against the sources below on 10 November 2026.

Most farms have at least one building that no longer earns its keep: a grain store nobody fills, a cattle shed from a herd that's gone. Class Q is the planning right that lets a building like that become a house without a full planning application. You still need the council's prior approval, but on a short list of practical matters, not on whether a house should be there at all.

Homes per farm, at most
10
Total floor space across the farm
1,000 m²
Largest any one home can be
150 m²

Does your building qualify?

These are the conditions in the 2024 version of Class Q. Your building has to pass every one.

  1. It's part of an established agricultural unit, or was

    The site must have been part of an established agricultural unit on 24 July 2023, or for at least 10 years if it joined the unit after that date. A building that has left the unit can still qualify if it was part of the unit on 24 July 2023 (or for at least 10 years before work starts, where it left after that date) and hasn't been used for anything other than agriculture since.

  2. It's not on protected land

    Class Q doesn't apply on "article 2(3) land": National Landscapes (still legally areas of outstanding natural beauty), National Parks, the Broads, World Heritage Sites and conservation areas. It also doesn't apply to listed buildings, scheduled monuments, sites of special scientific interest, safety hazard areas or military explosives storage areas.

  3. It can become a home without being rebuilt

    The works allowed are new or replacement windows, doors, roofs and exterior walls, services such as water, drainage and electricity, partial demolition where needed. These works can stick out up to 0.2 metres beyond the existing building, for new cladding for example. The existing building must be capable of meeting the nationally described space standard. A frame that can't take a new roof or walls without being rebuilt won't qualify.

  4. It has a suitable existing access to a public road

    This is a new test in the 2024 rules. Creating a new access to make a barn work isn't enough.

  5. No agricultural building works under permitted development in the last 10 years

    If the farm has put up, extended or altered agricultural buildings under the agricultural permitted development rights (Part 6, Class A(a) or B(a)) in the 10 years before the Class Q works start, Class Q isn't available.

  6. Any tenant agrees

    If the site is let on an agricultural tenancy, both landlord and tenant must give their express consent. If a tenancy was ended less than a year before work starts so that Class Q could be used, Class Q is ruled out unless landlord and tenant agree in writing that the land is no longer needed for farming.

How much you can build

The limits apply to the whole farm, not to each building, and they count any earlier Class Q conversions within the unit's original boundaries. So a farm that converts two barns now uses up part of an allowance that the next conversion will share.

One farm's Class Q floor space allowance

Two barns converted to five homes, out of a 1,000 m² limit

  • Barn 1: two homes
  • Barn 2: three homes
  • Still available
Show the numbers
Barn 1: two homesBarn 2: three homesStill availableTotal
Class Q floor space used across the farm290 m²420 m²290 m²1,000 m²

Illustrative farm. Every home in the example is 150 m² or less. Five homes leaves room for more within the 10-home limit, but only 290 m² of floor space to put them in.

You can also add a single-storey rear extension of up to 4 metres. It can be no higher than 4 metres (or the existing roof, if that's lower), its eaves can't be higher than the existing eaves, and it can only go onto hard standing that was there on 24 July 2023 (or for 10 years before work starts). The extension needs its own check in the prior approval, on its effect on any neighbouring property.

What changed in May 2024

Much of what's online still describes the old rules. If an article says the building had to be used solely for agriculture on 20 March 2013, or gives a five-home limit, it's out of date.

Class Q before and after 21 May 2024
Before 21 May 2024Since 21 May 2024
Most homes per farm510
Floor space limitsUp to 5 homes: at most 3 larger homes sharing 465 m², the rest smaller homes of 100 m² or less1,000 m² in total, 150 m² per home
Agricultural use testUsed solely for agriculture on 20 March 2013Part of an established agricultural unit on 24 July 2023
Former farm buildingsNot eligibleEligible if not used for anything else since
ExtensionsNot allowedSingle-storey rear extension up to 4 m, on existing hard standing
Access to a public roadNot a conditionSuitable existing access required

The transitional window for applications under the old rules closed at the end of 20 May 2025, so every new application now runs under the 2024 rules.

Prior approval: what the council looks at

For a conversion with building works, the council assesses these matters and nothing else. With no building works, design and external appearance drops off the list, and an extension adds one more: its effect on neighbouring property. It can't refuse because it would rather the barn stayed a barn, but it can refuse if it decides the building doesn't meet the Class Q conditions, or you haven't given it enough to show that it does.

  • Transport and highways impacts
  • Noise
  • Contamination
  • Flooding
  • Whether the location or siting makes the change impractical or undesirable
  • The design and external appearance of the building
  • Natural light in all habitable rooms

The council has 56 days from receiving the application, unless you agree a longer period in writing. If it doesn't give its decision in that time, the development can go ahead. Once approved, the conversion must be finished within three years.

Class Q prior approval or a full planning application
Class Q prior approvalFull planning application
What the council decidesOnly the listed mattersWhether the scheme is acceptable at all, against local and national policy
Fee from 1 April 2026£249, or £536 with building works£610 per home, for fewer than 10 homes
Time limit for a decision56 days, or it can go aheadUsually 8 weeks, with no approval if the council runs over
National Landscapes and conservation areasNot availableAvailable
Rebuilding or a new houseNot allowedPossible, if policy supports it
Design freedomLimited to the existing building and a small rear extensionWider, subject to policy

Where Class Q fits with selling your land

Class Q is about the buildings, not the fields. For most farms it sits alongside the bigger question of what the land could be worth. A prior approval for two or three homes in a redundant shed can add value to a farm sale, or give a family member a home on the farm. Where there's also a field with development potential, that's where our developer and self-build routes come in, and the two can run side by side.

Two cautions. Steel portal-frame sheds are often hard to convert without the works going beyond what Class Q allows, and councils check this closely. And a prior approval that leaves no money in the scheme once conversion costs are paid adds little to what a buyer will pay.

Not sure whether your building qualifies? Get in touch and we'll give you a straight answer.

Common questions

What is Class Q?

Class Q is a permitted development right in Part 3 of Schedule 2 to the General Permitted Development Order 2015. It allows an agricultural building, or a former one, to change to a house, with the building works needed to convert it, after the council gives prior approval on a set list of matters. It isn't a full planning application.

How many homes can I get under Class Q?

Up to 10 homes across an established agricultural unit, counting any earlier Class Q conversions there, with a combined floor space of no more than 1,000 m². No single home can be larger than 150 m².

Can I use Class Q in an AONB or National Landscape?

No. Class Q doesn't apply on article 2(3) land, which includes areas of outstanding natural beauty (now called National Landscapes), National Parks, the Broads and conservation areas. In those places a barn conversion needs a full planning application instead.

Can I use Class Q in the Green Belt?

Yes. The Green Belt isn't article 2(3) land, so Class Q is available there, subject to the same conditions as anywhere else.

How long does Class Q prior approval take?

The council has 56 days from receiving the application. If it hasn't told you its decision by then, the development can go ahead. Once prior approval is given, the conversion must be finished within three years.

Can I knock the barn down and rebuild it under Class Q?

No. The building works allowed are limited to windows, doors, roofs, exterior walls, services and partial demolition, as far as reasonably needed for the building to work as a house. A building that would need rebuilding to become a home doesn't qualify.

Sources

  1. The Town and Country Planning (General Permitted Development etc.) (England) (Amendment) Order 2024 (SI 2024/579), article 3: new Class Q
  2. General Permitted Development Order 2015, Schedule 2 Part 3: Class Q and paragraph W (prior approval)
  3. General Permitted Development Order 2015, article 2(3) and Schedule 1 Part 1: protected land
  4. Planning Portal: A guide to fees for planning applications in England, from 1 April 2026
  5. NPPF Chapter 6, policy HO11: isolated homes in the countryside
  6. Kent Downs National Landscape: What is a National Landscape?
  7. SI 2024/579, article 10: transitional provision for the previous Class Q (applications until the end of 20 May 2025)
  8. Defra MAGIC map: National Landscape (Area of Outstanding Natural Beauty) boundaries
  9. Draft Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) (Amendment and Transitional Provision) Regulations 2026 (proposed fees from 8 December 2026)

This guide is general information, not legal, tax or financial advice. Every site is different: take advice from a solicitor and an accountant before you sign anything.